Quote

Quote

Project progress

There are a number of stages to a successful project. This process is the fruit of 20 years' experience and 8500 projects carried out. It is necessary to ensure that your project progresses smoothly and to guarantee your satisfaction.


Even if it seems a little rigid, it generally flows naturally and smoothly!

Week

0

Meeting / Call / Visio Conference to launch project

Week

1

Quote submission

Week

3

Quote approval / Purchase order signature

Week

4

Sample production

Week

10

Samples received by customer (airfreight)

Week

11

Samples approved by customer

Week

12

Batch production

Week

14

Quality inspection / Report / Photos

Week

15

Shipping

Week

20

Reception of goods at your offices

The timetable shown here is indicative, and is based on the production of low-complexity parts.

Price calculation

Prices for parts and sub-assemblies depend on :

  • Quantities required
  • Material and price of raw material at this time
  • Part weight
  • Part design (complexity)
  • Production method
  • Time required (machining, welding)
  • Surface treatment (finishing, painting)
  • Degree of aesthetic finish
  • Dimensional tolerances required
  • Tooling required (molds, special tools)
  • Tests required (hardness, durability)
  • Specific requirements (material, etc.)
  • Volume and weight of parts for shipping
  • Shipping protection and packaging requirements
  • Number of deliveries required
  • Delivery destination
  • Safety stock or local storage (if desired)

Elements to provide

To prepare a quote, we need the following information:

  1. 2D Technical Drawings / 3D files if they exist
  2. Your sample of the part (if possible)
  3. Quantity requested (generally, annual quantity needed)
  4. Material
  5. Finish/Surface Treatment
  6. Delivery Schedule (number of deliveries)

Quote request

"*" indicates required fields

Max. file size: 50 MB.
Joindre un fichier PDF de votre projet de pièces / assemblage, avec les quantités annuelles souhaitées.